September 9, 2020

While the capabilities of the forming and shoring systems that Advance Shoring provides are market leading, the decades of experience in our design group is second to none. 

The contractor had previously purchased as set of Meva Imperial formwork from Advance Shoring an...

July 8, 2020

After several recent severe storms, the Lakewalk on Canal Park in Duluth, MN has taken a beating from the powerful waves of Lake Superior.  The shoreline sustained heavy damage with large portions of the boardwalk completely washed out near the iconic Aerial Lift Bridg...

May 6, 2020

5/1/2020 
 
FOR IMMEDIATE RELEASE: 
 
We are excited to announce that, effective May 1, 2020, Advance Triwest Equipment, Ltd. has acquired Advance Equipment Company. Advance Triwest Equipment Ltd. is part of Morwest Group which includes Morwest Crane and Service out of...

November 4, 2019

Advance Shoring is excited to announce the addition of the MevaLite formwork system to their rental fleet.   The MevaLite system is a high-quality, light-weight clamp system for fast, crane independent project.  Often referred to as the little brother to the Meva Imper...

The Advance Shoring Company worked with Contractor, Adolfson & Peterson Construction, on the Mill Street Municipal Parking ramp located in Wayzata, MN. This project addressed the busy downtown’s need for parking by adding an additional 385 public parking stalls. This c...

Please reload

Featured Posts

Quaker Oats Flood Wall – Cedar Rapids, IA

September 9, 2020

1/4
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • Black Facebook Icon
  • Black Google+ Icon

1400 JACKSON STREET, SAINT PAUL, MN 55117     //     651-489-8881