ABOUT US           | SHORING           | FORMING           | EQUIPMENT           | EMPLOYMENT         | CONTACT US

From concept to completion, Advance is dedicated to providing Contractors with tower cranes, personnel hoists,  forming, shoring and scaffolding equipment and services. Advance concentrates on offering the highest quality equipment with a commitment to assist the customer with detailed layout instructions that promote the proper use of the equipment and construction safety.

Advance Shoring is involved with more than 2,000 construction projects each year. Among the thousands of projects over the years, some of our higher profile projects have been the 3M World Headquarters, Xcel Energy Center, St Paul Cathedral, Science Museum, Highbridge Power Plant, Orville Freeman Building, Regions and Children’s Hospitals.

 

Advance represents manufacturers of the highest quality and most technologically advanced construction equipment. In the early 1960's, Advance developed the first use of "Flying Forms" with Beaver shoring equipment. In 1972, Advance became the first distributor of Aluma forming products. In the years to follow, Advance has taken on other quality equipment lines such as Titan aluminum shoring and MEVA formwork.

 

ADVANCE ● 1400 JACKSON STREET ● SAINT PAUL, MN ● (651) 489-8881

COPYRIGHT © 2008 ● ALL RIGHTS RESERVED